Telephone

954.435.7010

Telephone

Miramar Boulevard

Roadway / Infrastructure

This project consisted of the expansion of an existing two-lane roadway into a four-lane roadway along Miramar Boulevard from Hiatus Road to Palm Avenue (a mile-long stretch). Duties of the firm included full permitting services, stormwater management analysis, plans preparation (including paving, grading, & drainage plans; pavement parking & signage plans; and erosion & sediment control plans), utility coordination, traffic signalization modifications, irrigation, landscaping, and construction administration services.