QUICK FACTS
Location
Miami Beach, Florida
Building Use
Roadway & Infrastructure Improvement
- Paving & Grading Design
- Drainage Design
- Potable/Domestic Water Design
- Topographic & Boundary Survey
This project consisted of water main, sanitary sewer, drainage, and roadway reconstruction throughout the Venetian Islands of San Marino, Di Lido, and Rivo Alto.
The drainage design included permitting of six stormwater pump stations including water quality units, trash racks, and energy dissipater structures. It also included the construction of new outfalls, removal of existing drainage systems, installation of a new drainage system, reconstruction of the roadway base, installation of new asphalt, installation of new valley gutters to efficiently convey stormwater to the designed stormwater management system, redesign of the existing landscaping environment and street lighting for all three islands. The new stormwater outfalls and installation of new stormwater control structures complied with the necessary environmental regulations for discharging stormwater into Biscayne Bay. The project also included coordinating with utility companies for the relocation of utilities where required and all permitting services.
Our tasks also included coordinating the interior island streets with Miami-Dade County’s designs for improvements of the Venetian Causeway. To that end, our firm analyzed the harmonizing between the Venetian Causeway and interior streets, as well as between the interior streets and all 365 adjacent properties. The firm’s duties included design services, bidding and awarding services, and construction administration services.